Main NavigationNews >  Detailed News from 2012-05-29

Hatecke|News and Information

Keep update about our information: Join our mailing list!

2012-05-29: Preparing for Future Demands

(Krautsand) Due to the growth of Hatecke especially in the cruise industry, our company premises have been extended with a new production workshop of glass-fibre and carbon-fibre reinforced parts. After a building period of nearly 12 months the new 4680 m² production workshop was ceremonially inaugurated on April 30, 2012 to begin its operations soon.  The workshop is equipped with six cranes, heating system for 21° C and ventilation system with biological filter to reduce emissions. With this investment we are well prepared to meet the future demands.